Skip to content
Monday – Friday: 6 a.m. – 4 p.m.(281) 555-0100

Sod and site work for builders

Sod down and signed off, lot after lot

We bid, deliver and install sod, sprinklers and first plantings for homebuilders west of Houston, by lot type, with the paperwork your office needs sent before the crew arrives.

  • Bid by lot type
  • English and Spanish crews
A row of new two-story houses with bare, graded back yards ready for sod

Turn-around

The days a schedule runs on

Four numbers a superintendent asks for before anything else.

  • 2

    working days to a bid, from complete plans and a lot list

  • 1

    working day to lay sod on a standard lot, once the pad is released

  • 2

    working days to close a punch list after your walk

  • 5

    working days for sprinklers on a standard lot, ahead of the sod

Sample days. Your bid and agreement set them for each community.

Per-lot bid

From a lot list to a signed-off lot

The same five steps on every section, so your office knows what comes next.

  1. 01

    Step 1: Send the lot list and plans

    Lot numbers, plan types, release dates and the community. A spreadsheet works. So does a photo of the plat.

  2. 02

    Step 2: We walk the section

    Our estimator walks a sample of lots for grade, access and water, and flags any lot that needs fill or a swale.

  3. 03

    Step 3: You get a bid by lot type

    One line per plan and lot size. Corner lots and slopes are listed on their own lines, with what is not included.

  4. 04

    Step 4: Release lots as they close

    Send a release when the pad is graded and the water is on. We confirm the date back in writing.

  5. 05

    Step 5: Install, then sign off lot by lot

    The crew leader walks each lot with your superintendent. The punch list and photos stay in one thread; the invoice and lien waiver follow.

Paperwork

What your office asks for, on request

Ask once and we email it. A certificate comes with your company named as holder, so ask with the wording your office uses.

  • Certificate of insurance

    General liability and workers' compensation, with your company named as certificate holder.

    Request a certificate
  • W-9

    Signed and current, sent with your vendor setup form.

    Request our W-9
  • Irrigator license

    Our Texas irrigator license number and where to look it up, for each sprinkler permit.

    Request the license copy
  • Lien waivers

    Conditional and final waivers with each invoice or draw, on your form or ours.

    Ask for a sample waiver

What we install

Four trades, one crew schedule

Sod, sprinklers, beds and trees, and the last pass of grade, booked together so one lot is not waiting on three subs.

  • Gloved hands unrolling a strip of sod onto fresh soil

    Sod

    St. Augustine, Bermuda and zoysia by the pallet, laid, rolled and edged to the walk and curb.

    About sod
  • A pop-up sprinkler spraying a low fan of water across new grass

    Irrigation

    Zones drawn from the plat, sleeves and heads set, a backflow device and a controller, installed under a Texas irrigator license.

    About irrigation
  • Two workers in hard hats and high-visibility vests staking young trees on a grassy site

    Beds and trees

    Bed prep, mulch, shrubs and the street trees your community requires, planted to the approved plan.

    All services
  • A gravel-filled drainage trench cut across a lawn

    Final grade and drainage

    Swales, drain lines and downspout extensions where a pad drains toward a neighbor. We mark any lot that needs your grading crew back.

    All services

The crew

Eighteen people, two sod crews, and an office that answers

Two sod crews, an irrigation crew, a beds and trees crew, an estimator and an office for the paperwork. The same crew leaders come back to the same builder's next section.

  • Crew leaders walk each lot with your superintendent

  • Photos of each finished lot, texted to your super

  • English and Spanish at the office and with two of three crew leaders

A white pickup and a small dozer at a cleared site with fresh dark soil

From the field

What builders say about a section

“We send a release in the morning and the pallets are on the lot the day we agreed. The punch list comes back as photos in the same text thread.”

Mitchell H.Superintendent, new-home community

“The bid has a line for every plan type, so I can match it to our lot list without a call. The certificate and W-9 came with the first one.”

Zoe P.Purchasing, regional builder

“Corner lots and slopes were their own lines, so nothing surprised us at the draw.”

Dominic S.Land coordinator, townhome builder

Sample reviews.

Service area

West of Houston, from Katy to Brookshire

The communities where our crews are already working, in three counties.

Aerial view of a suburban house with landscaped beds, a curving walk and a lawn

Harris County

  • Katy
  • Addicks
  • Barker
  • Hockley

Fort Bend County

  • Fulshear
  • Weston Lakes
  • Simonton
  • Cross Creek Ranch

Waller County

  • Brookshire
  • Waller
  • Pattison
  • Hempstead

We don't bid sections east of Beltway 8, south of Highway 90A or north of Highway 105.

ZIP codes: 77449, 77450, 77493, 77494, 77423, 77441, 77084, 77095, 77447, 77484, 77445, 77466

Questions

What a superintendent asks first

How do you price a section?

By bid, lot by lot, from your plans and lot list. There is no price list. Each bid has a line for every plan type and lot size, with what is included and what is not, and corner lots and slopes on their own lines.

How soon can you start, and how long does a lot take?

Start dates come from your release. Once the pad is graded and water is on, sod on a standard lot is usually laid in a day, and sprinklers go in before it. Your bid lists the working days for each step.

Are you licensed and insured?

Sprinkler work is done under a Texas irrigator license; the number is in the footer, with a lookup link when the owner adds it. We carry general liability and workers' compensation, and Emilia emails the certificate with your company named as holder.

How do you invoice?

Per lot or per draw, as your agreement says. A lien waiver goes with each invoice, on your form or ours. Payment terms are set in the bid, not in a rate card.

Who waters new sod?

The new owner. We leave a one-page watering sheet for each lot, in English and Spanish, that your sales office can hand over at closing. Sprinkler zones are set up and the controller is programmed before we leave.

Send a lot list

Tell us the community, how many lots and when the first one is released. We write back to set up a walk.

Hours
Monday – FridayToday
6 a.m. – 4 p.m.
SaturdayToday
7 a.m. – 12 p.m.
SundayToday
Closed
What the lots need

The walk is where we look at grade and water. The written bid follows it, by lot type.